Tekla Structures → Lighthouse
Model Import
We don't replace Tekla — we consume it.
Lighthouse keeps detailing in Tekla Structures. We ingest the BSWX model export and explode it into
assemblies and marks carrying every material, length, grade, surface treatment and physical property —
ready for nesting, procurement and the shop floor.
Tekla Structures import
PerthAirport-T1_RevC.bswx
Tekla Structures 2024 · Rev C · Perth Airport T1 Domestic Expansion
Assemblies
986
Parts / marks
3,140
Total weight
612 t
Material lines
11
Extracted bill of materials
| Profile | Grade | Qty | Tonnes |
|---|---|---|---|
| 460UB82.1 | 300PLUS | 36 | 28.4 |
| 310UC158 | 300PLUS | 18 | 23.3 |
| 530UB92.4 | 300PLUS | 16 | 18.3 |
| PL20 Gr250 | AS/NZS 3678 Gr250 | 120 | 16.9 |
| 610UB125 | 300PLUS | 8 | 15.8 |
| 250UC89.5 | 300PLUS | 16 | 9.7 |
| 360UB56.7 | 300PLUS | 20 | 8.4 |
| 150x150x9 SHS | C350L0 | 48 | 8.1 |
| 300PFC | 300PLUS | 12 | 5.0 |
| 200x100x6 RHS | C350L0 | 16 | 2.5 |
| PL16 Gr350 | AS/NZS 3678 Gr350 | 48 | 1.5 |
Surface treatments (from model)
Hot Dip Galvanised — AS/NZS 468058.1 t
2-Pack Epoxy (150µm)29.9 t
Inorganic Zinc Silicate23.3 t
Intumescent — 90/90/9015.8 t
Prime + Top Coat10.9 t
Rev CChange detected vs previous revision
Grid F/8–F/12 truss upgraded 460UB82→530UB92; 12 cleats deleted. Re-nest required on affected 530UB stock.
+34 added~61 modified−12 deleted
All model imports
| Model file | Project | Revision | Source | Assemblies | Parts | Tonnes | Imported | Status |
|---|---|---|---|---|---|---|---|---|
| PerthAirport-T1_RevC.bswx | Perth Airport T1 Domestic Expansion | Rev C | Tekla Structures 2024 | 986 | 3,140 | 612 | 09 July 2026 | Submitted |
| MurdochHKP-BldgB_RevE.bswx | Murdoch Health & Knowledge Precinct — Bldg B | Rev E | Tekla Structures 2024 | 604 | 1,980 | 388 | 28 June 2026 | Confirmed |
| ECUCity-Podium_RevA.bswx | ECU City Campus — Podium Steel | Rev A | Tekla Structures 2024 | 1,210 | 4,020 | 740 | 02 July 2026 | Confirmed |
| Curtin-Bldg5_RevD.bswx | Curtin University — Exchange Precinct Bldg 5 | Rev D | Tekla Structures 2023 | 358 | 1,120 | 236 | 30 May 2026 | Confirmed |
| FSH-PlantRoom_RevB.bswx | Fiona Stanley Hospital — Plant Room Upgrade | Rev B | Tekla Structures 2024 | 132 | 420 | 74 | 11 June 2026 | Confirmed |
| GudaiDarri-Conveyor_RevA.bswx | Gudai-Darri — Conveyor Support Steel | Rev A | Tekla Structures 2024 | 688 | 2,240 | 520 | 06 July 2026 | Confirmed |