Lighthouse Engineering

Tekla Structures → Lighthouse

Model Import

Load a model export (.bswx or .kss), preview the structure, then Import & auto-assign to explode it into marks and match every profile to inventory, allocating stock and raising draft POs against the selected job.

Structural model import · KISS / .bswx

No file loaded, use the sample model or choose a file.

Download sample ↓
  1. 1 Choose the project to assign to, top right.
  2. 2 or to preview the structure.
  3. 3 Hit Import & auto-assign to match every profile to inventory and raise draft POs.

Assigned material requirements

Last import 14 July 2026 · PerthAirportT1_RevD.bswx
ProjectProfileGradeReq.AllocatedShortfallStatus
LE-2026-014 460UB82.1 300PLUS 27 22 5 Part-received
LE-2026-014 530UB92.4 300PLUS 23 6 17 Part-received
LE-2026-014 310UC158 300PLUS 11 4 7 Part-received
LE-2026-014 610UB125 300PLUS 11 9 2 Part-received
LE-2026-014 360UB56.7 300PLUS 21 21 - Received
LE-2026-014 150x150x9 SHS C350L0 34 12 22 Part-received
LE-2026-014 250UC89.5 300PLUS 13 13 - Received
LE-2026-014 PL20 Gr250 AS/NZS 3678 Gr250 15 5 10 Part-received
LE-2026-014 300PFC 300PLUS 17 15 2 Part-received
LE-2026-014 200x100x6 RHS C350L0 25 9 16 Part-received
LE-2026-014 460UB67.1 300PLUS 6 0 6 Overdue
LE-2026-014 PL25 Gr350 AS/NZS 3678 Gr350 6 3 3 Part-received
LE-2026-014 PL16 Gr350 AS/NZS 3678 Gr350 21 7 14 Part-received

All model imports

Model fileProjectRevisionSourceAssembliesPartsTonnesImportedStatus
PerthAirport-T1_RevC.bswx Perth Airport T1 Domestic Expansion Rev C Tekla Structures 2024 986 3,140 612 09 July 2026 Submitted
PerthAirportT1_RevD.bswx Murdoch Health & Knowledge Precinct — Bldg B Rev D Tekla Structures 2024 22 428 157 13 July 2026 Confirmed
ECUCity-Podium_RevA.bswx ECU City Campus — Podium Steel Rev A Tekla Structures 2024 1,210 4,020 740 02 July 2026 Confirmed
Curtin-Bldg5_RevD.bswx Curtin University — Exchange Precinct Bldg 5 Rev D Tekla Structures 2023 358 1,120 236 30 May 2026 Confirmed
FSH-PlantRoom_RevB.bswx Fiona Stanley Hospital — Plant Room Upgrade Rev B Tekla Structures 2024 132 420 74 11 June 2026 Confirmed
GudaiDarri-Conveyor_RevA.bswx Gudai-Darri — Conveyor Support Steel Rev A Tekla Structures 2024 688 2,240 520 06 July 2026 Confirmed